Treasure
X

Establishing network works for the project of housing all Egyptians, plot No. 2 (60 acres) in Suez Governorate

First: Main distributor building

It contains 17 medium voltage cells (11 kV) to feed 23 dry transformers (1 MVA) via 4 rings

Second: Electricity room

It contains a dry transformer with a capacity of (1 MVA) and a general low voltage panel and a ring connection unit panel to feed 7 to 8 buildings for each room

Third: Cable works

Excavation works and laying of medium voltage cables were established to connect between the distributor and the rooms

A total of 9000 m

Excavation works and laying of low voltage cables were established to connect between the rooms and buildings with a total of 26000 m.t

Fourth: General site lighting works

A number of 243 street lighting poles, double and single, were raised with a height of 9 meters for each pole

Fifth: Civil works

A number of main distributor buildings and 23 Electrical room, including excavation, concrete and finishing works.